JavaScript Required

The P4H website is designed to perform best with Javascript enabled. Please enable it in your browser. If you need help with this, check out https://www.enable-javascript.com/

RBF process assessment up-dates - P4H Network

RBF process assessment up-dates

The RBF scheme  completed its pre-pilot phase in Kishapu district of Shiniyanga Region and is rolling out gradually since beginning of 2016 in other regions.

The initial pre-pilot phase was assessed against the originally intended RBF design for Tanzania end of 2016 and presented to the Ministry of Health.  The assessment has in mind to inform the further roll-out of RBF and was supported by P4H partners (GIZ, WHO).

Attached find a final draft document with the study’s findings, which is currently still undergoing some professional editing before official publishing.

20170117_TZ RBF Process Assessment Report-last draft before final edit

Reference
06 Feb 2017